Removal of asbestos and fibreboard ceilings throughout and replacing with new suspended ceilings, including the replacement of internal fire check doors and screens to meet current regulations.
The full design and installation to upgraded existing fire alarm installation to an L3 system which requires all the emergency escape routes and rooms leading to an emergency exit be covered by fire detectors, with a manual call point at every exit door as described in BS5839, including all ancillary works required for compliance.
The works generally include the following;